A unique task, in the midst of a global pandemic. With good spirit, the lock-downs and travel issues of the past year were safely overcome and we look back on a fine project with satisfaction. In total, there is almost 700m² of craftsmanship; three movable floors, a movable retaining wall and a disabled lift. From toddler swimming lessons to Olympic swimming pools; with these high-tech facilities, both the competition pool and the target group pool have unprecedented versatility.
The competition pool has two movable floors separated by a retaining wall. Each of these facilities can be operated separately, allowing easy switching between one 50-metre pool or two smaller pools.
The target group pool is equipped with a single movable floor and a disabled lift in an alcove. This ensures that every target group has easy access to the pool.